
The technical and engineering unit of the College of Dentistry University of Basrah, has readied, installed and turned-on a new electric generator instead of the consumed one to compensate for the shortage of electricity.
The team responsible for the installation announced that the generator with an electrical capacity of 500KVA ensures the delivery of sufficient electric current to operate the electrical devices, Especially cooling devices, in order to avoid the heat wave.
As The university is keen to provide more services to the students, especially during the examinations period.